|
SIN 899-1: Environmental Planning Services and Documentation
-
Environmental impact statements under NEPA
-
Endangered species and / or wetlands analysis
-
Watershed and other natural resource management plans
-
Environmental program management and environmental regulation
development
-
Economic, technical, and / or risk analysis
-
Vulnerability assessments
-
Identification and mitigation of threats
-
Wetlands investigation, delineation, plans and mitigation
-
Environmental assessments (Phase I and Phase II)
-
Due diligence
-
Risk assessments
-
Preliminary assessments
-
Sampling and analysis
-
Natural resource damage assessments
-
Brownfields
SIN 899-2: Environmental Compliance Services
-
Environmental compliance audits
-
Compliance management and / or contingency planning
-
Permitting (air, water, NPDES, and solid and hazardous waste)
-
Spill prevention / control and countermeasure plans
-
Pollution prevention surveys
-
ISO 14000, environmental management systems (EMS)
-
Community right-to-know act reporting
-
OSHA compliance
-
RCRA compliance
-
Underground and aboveground storage tanks (UST and AST)
-
Safety and health programs
-
Industrial hygiene
-
Hazardous and solid waste management
-
PPC plans
-
SPCC plans
-
Air emissions testing and modeling
-
Indoor air quality and mold
-
SARA Title III
-
EPCRA
-
Emergency preparedness planning
-
Title V permitting
-
Stormwater management
-
Asbestos
-
Lead
-
Mold
-
Regulatory coordination
-
Environmental assessments (Phase I and Phase II)
-
Risk management plans (RMP)
SIN 899-4: Waste Management Services
-
Data collection, feasibility or risk analysis
-
RCRA / CERCLA site investigation
-
Hazard and exposure assessments
-
Waste characterization and source reduction studies
-
Review and recommendation of waste tracking or handling systems
-
Waste management plans and / or surveys
-
Review of technologies and processes impacting waste management
-
Site assessments
-
Risk assessment
-
Groundwater characterization and monitoring
-
RI / FS
-
Waste minimization
-
Health and safety plans
-
Landfill construction and closure design
SIN 899-7: Geographic Information Systems (GIS)
-
Mapping and cartography
-
Natural resource planning
-
Site selection
-
Migration pattern analysis
-
Pollution analysis
-
Emergency preparedness planning
-
Geologic logs, topographic data, 3D / 4D interactive visualization
packages
-
Data interpretation
SIN 899-8: Remediation Services
-
Preparation, characterization, field investigation, conservation
and closure of site
-
Long term monitoring / long term operation (LTM / LTO)
-
Remedial design of containment, monitoring and / or reduction
systems for hazardous waste sites
-
Air monitoring, including ambient, personnel and workplace
-
Wetland restoration
-
Health and safety plans
-
Waste management plans
-
Asbestos abatement design
-
Lead abatement design
-
Mold abatement
-
Brownfields
To learn more about GSA contracting please see the links below:
www.fss.gsa.gov/schedules
www.gsaadvantage.gov
|
|